The Edward Hynes Charter School.
Despite initial scepticism from the general contractor, SLS demonstrated the effectiveness of prefabrication.
SLS streamlined the construction process and showcased the power of offsite prefabrication.
SLS manufactured prefabricated metal stud wall panels for 95% of the interior and 100% of the exterior walls.